Assessment of environmental risk of radioactively contaminated industrial tailings

INTAILRISK

Problem statement The INTAILRISK project: Project results Database Project partner information Links Home

Objectives Participants Methods Test sites

 

TEST SITES:

Slovenia

Serbia & Montenegro

Croatia

Albania

Russia

Kyrgyzstan

Coal mine Tusnica and coal fired power plant Kakanj

The coal mine Tusnica is situated near the town Livno, in the south-west of Bosnia and Herzegovina. It extracts brown coal and lignite of Miocene age. Preliminary measurements have shown the high levels of the 238U (up to 586 Bq/kg) and 226Ra (up to 682 Bq/kg). During the year 2000, more than 90 % of mine's production has been used for domestic purposes in broad region of town Livno (25 000 inhabitants). The coal mine consists of several strip mines. The highest level of radioactivity has been recorded in the strip mine of brown coal (“DRAGE”) located at the base of the mountain Tusnica. Assessed reserves of the deposit are approximately 331 000 tons with assessed uranium content of approximately 900 tons.
The coal from that deposit is mainly used in power production (CBPP Kakanj) and small part of coal production is used in nearby households. The coals from the other lignite deposits, which show lower values of dose rate, are used mainly in households in municipality Livno.
There are a few houses in a radius of 2 kilometres from the deposit, which use the mentioned coal for heating. A brook accumulates the water from the deposit and has been used for irrigation. Water from the other lignite deposits is pumped in the irrigation system and used for agriculture.

The CBPP Kakanj
Coal from coal mine Tusnica is used in coal fired power plant Kakanj in central part of Bosnia and Herzegovina. Use of the mentioned coal has decreased during the last five years. The CBPP is located approximately 5 km from the town Kakanj (45 000 inhabitants). CBPP Kakanj and waste storage site are placed in the valley of river Bosnia. Assessment of the environmental, health and radon risk for the population in Kakanj has not been performed yet.

Parameter
Minimum (%)
Maximum (%)
Total humidity 4.00 16.00
Ash 14.05 43.46
Sulphur total 1.80 2.70
Sulphur in ash 0.52 1.04
Volatile 23.51 28.79
Combusted matter 46.03 60.30
Produced power Real power Volume burned material/year Production of waste/yea Emission of ash/year Efficiency of filters
450 MW 410 MW 1,5 million tons 550 000 tons 5 500 tons 99,3%
Coal
mine
Activity (Bq/kg)
Consumption (2003) U-238 U-235 Th-232 Ra-226
Breza 272174 59.73 1.38 15.49 13.03
Vrtliste 301246 55.64 2.57 31.78 55.04
Haljinici 298682 37.16 1.71 16.91 47.94
Stara jama 314020 30.96 1.43 11.62 25.74
Zenica 143878 42.61 1.96 9.45 33.78
Tusnica 28424 603.53 21.72 16.59 705.55
Bila 53910 26.3 1.21 11.35 25.65
Gracanica 65591 80.26 3.58 2.18 61.59

The waste

Waste storage is placed near the facility and river Bosnia over an area of 19 hectares. Capacity of the waste storage site is 1 million tons. Approximately 400 000 tons has been used for industrial purposes and 150 000 has been deposed at waste storage site per year. The storage site has possibility for expansion.

There are seven villages in the neighbourhood of the waste storage site at a distance less than 2 km. Approximately 3500 residents live in these villages.
The main natural factors for dispersion of waste materials are wind and rainfall. The dominant directions of the wind are as follows:
- North northwest-south southeast for the winter period
- South southwest-North northeast for the summer period
Rainfalls rinse out the deposed materials and bring them to river Bosnia directly or indirectly by the brook on the foot of the waste-hill.
There are three main reservoirs in the area of town Kakanj that are used for drinking water. These reservoirs are probably not influenced by wastes of CBPP Kakanj. However, two reservoirs of technological water (Dragici and Hrasno) in the area of town Kakanj might be influenced by the wastes.

Measurements of dose-rate on waste disposal site have shown values up to 0.25 microSv/h as result of the use of coal from coal mine Tusnica.
Waste material has been used for production of building materials during the last fourty years. Main building products produced by waste material from CBPP Kakanj are cement and slag bricks. Approximately 400 000 tones of waste has been used in building industries per year. A smaller part of the waste is mainly used as landfills for the roads during the winter period.